Readiness and hold-point gates

Configure readiness and hold-point gates so work does not proceed without required test evidence, certifications and approvals.

Readiness and hold-point gates enforce the sequence compliance programmes depend on. Before downstream work proceeds, the workspace checks that required tests, certifications, photos and approvals are present.

Gates reduce the pattern where work continues on trust and paperwork catches up weeks later. Missing evidence becomes visible at the point of decision rather than during audit.

Gates integrate with Safety ITP hold points where both modules are enabled, but Compliance gates focus on test and certification evidence rather than general SWMS authoring.

The problem this solves

Hold points fail in practice when checks live on paper sign-off sheets disconnected from the test record. Approvers sign without seeing whether evidence actually exists.

Digital gates tie approval to retained evidence so hold points mean something at mobilisation time.

Workflow narrative

  1. 1. Define gate rules

    Configure which evidence and approvals are required before each downstream step.

  2. 2. Capture prerequisite evidence

    Complete tests, certifications and attachments that satisfy gate requirements.

  3. 3. Review and release

    Authorised reviewers approve hold points when evidence is complete.

  4. 4. Audit gate history

    Retain who released each gate, when and against what evidence.

In the product

Verified product evidence

Hold-point programme context
Imagery representing construction and maintenance programmes where readiness gates apply.
Services commissioning context
Supporting imagery for hold points around commissioning and services compliance.

Outcomes

  • Fewer downstream surprises from missing evidence
  • Clear approval accountability
  • Better alignment between field work and compliance records
  • Reduced audit reconstruction effort

Applicable standards

  • Project ITP requirementsSite-specific hold-point and witness rules
  • ISO 9001Quality management - control of documented information

Limitations

Gate design quality

Gates only work when configured to match real project sequencing and authority requirements.

Cross-module dependencies

Some hold points may depend on Safety or Workforce records when those modules are enabled.

FAQ

Common questions

Can gates differ per project?
Yes. Gate rules can be scoped according to workspace and project configuration.
Who can release a hold point?
Release permissions follow workspace role configuration.
Do gates replace engineer inspection?
No. Gates enforce evidence presence; professional inspection remains a separate responsibility.
Can we see blocked work items?
Register and dashboard views can surface items waiting on gate release according to configuration.