Veritas MEP

HVAC Maintenance Services

Comfort and air quality kept compliant, with maintenance certificates assembled from structured servicing data.

HVAC systems affect comfort, energy cost, indoor air quality, and code compliance, and they are among the most maintenance-intensive building services. Veritas MEP delivers planned HVAC maintenance that keeps systems efficient and compliant, and captures every visit as structured data so certificates and the maintenance register are assembled automatically rather than reconstructed at year end.

HVAC maintenance covers air-handling units, chillers and condensers, fan coil units, pumps, ductwork and dampers, filters, controls and BMS points, and ventilation rates. Servicing references AS 1668 for mechanical ventilation and air-conditioning and follows manufacturer schedules. Indoor air quality and ventilation performance are checked where relevant to occupancy and code.

Each service visit records the tasks completed, readings, parts replaced, faults raised, and the compliance result against the asset. From this structured data, HVAC maintenance certificates are produced and the asset maintenance register is kept current. The history stays with the building on the Veritas Ledger, independent of any servicing contractor.

Veritas MEP maintains HVAC and mechanical services across commercial, healthcare, education, retail, and critical facilities Australia-wide, with planned-preventive schedules and reactive support.

Deliverables

What's Included

Air-handling unit servicing
Chiller, condenser, and cooling-tower maintenance
Fan coil unit and pump servicing
Ductwork, damper, and filter maintenance
Controls and BMS point verification
Ventilation-rate and indoor air-quality checks
Belt, bearing, and motor condition assessment
HVAC maintenance certificates
Asset maintenance register and PPM schedule
Reactive and emergency support

Methodology

Our Process

1

Asset and Schedule Setup

HVAC plant is registered against the building and a planned-preventive maintenance (PPM) schedule is built from manufacturer requirements and code obligations.

2

Planned Service Visit

Technicians service air-handling units, chillers, pumps, filters, ductwork, and controls per the PPM schedule, checking ventilation and air quality where relevant.

3

Findings Capture

Tasks completed, readings, parts replaced, faults raised, and the compliance result are recorded as structured data against each asset.

4

Certificate Assembly

HVAC maintenance certificates are assembled from the structured servicing data, and the asset maintenance register and PPM schedule are updated.

5

Anchoring and Continuity

Records and certificates are anchored to the Veritas Ledger, keeping the maintenance history with the building across contractor changes.

Technical Data

Technical Specifications

Plant coveredAHUs, chillers, cooling towers, FCUs, pumps, ductwork
Service basisAS 1668, AS/NZS 3666, manufacturer schedules
Air qualityVentilation-rate and IAQ checks where relevant
RecordsHVAC maintenance certificate + asset register + PPM
ContinuityHistory anchored to the Veritas Ledger
CoverageAll Australian states and territories

Compliance

Australian Standards

AS 1668.1:2015

Fire and Smoke Control in Buildings

Governs the fire and smoke-control aspects of mechanical air-handling that maintenance must preserve.

AS 1668.2:2012

Mechanical Ventilation in Buildings

Defines required ventilation rates and air-quality provisions verified during HVAC maintenance.

AS/NZS 3666

Air-Handling and Water Systems (Microbial Control)

Governs microbial control in air-handling and water systems such as cooling towers, central to HVAC maintenance.

AS/NZS 3000:2018

Electrical Installations (Wiring Rules)

Governs electrical safety for HVAC plant connection and maintenance work.

FAQ

Frequently Asked Questions

What does an HVAC maintenance certificate cover?

An HVAC maintenance certificate documents that the mechanical services have been serviced to the required schedule and are performing to the relevant standards, typically AS 1668 for ventilation and air-conditioning and AS/NZS 3666 for microbial control in air-handling and water systems. With Veritas MEP, the certificate is assembled from the structured data captured at each service visit, so it reflects exactly what was checked and found rather than a generic sign-off.

Why does cooling-tower and air-handling maintenance matter for health?

Cooling towers and air-handling systems can harbour and distribute microbial contamination, including Legionella, if not properly maintained. AS/NZS 3666 sets the microbial-control requirements, and regular servicing, cleaning, and water treatment are how those requirements are met. Recording this servicing permanently matters for public-health compliance and for demonstrating duty of care, which is why the records are anchored to the Veritas Ledger.

Can HVAC maintenance reduce energy costs?

Yes. HVAC is often the largest energy consumer in a building, and poorly maintained plant (dirty filters and coils, failing controls, drifting setpoints, worn belts) runs harder for less output. Planned maintenance keeps plant efficient, and the structured record helps identify chronically underperforming assets worth upgrading. The trend data preserved on the asset record supports those capital decisions.

Do you maintain HVAC in healthcare and other sensitive environments?

Yes. Healthcare, laboratory, and similar environments have stringent ventilation, filtration, and air-quality requirements, and their HVAC maintenance is correspondingly more demanding and more heavily scrutinised. Veritas MEP services these environments to the applicable standards and keeps a permanent, verifiable record of the servicing, which is essential where compliance is audited and the consequences of failure are high.

Coverage

Available Across Australia

We deliver hvac services in all major Australian cities. Select a location for city-specific information.

Sectors

Industries We Serve

Our hvac services are tailored to the specific requirements of each sector.

Get started with hvac

Contact our team for a scope discussion and quote. We respond within one business day.